Radioactive Water Leaks at Fukushima Plant
2 images
© 2002~2011, Nippon News. All rights reserved.
Not finding what you are looking for ? Call us -> +81-3-5550-2120
Email us : contact,nipponnews,net
Powered by WordPress. Entries (RSS), using Swift by Satish Gandham a product of SwiftThemes.Com, customized by Paul de Mercey

![December 4, 2011, Okumamachi, Japan - Water seeps through a hair-thin crack in the base concrete of a desalination facility at Fukushima No. 1 nuclear power plant in Okumamachi, Fukushima Prefecture, some 210km northeast of Tokyo in this photo released by Tokyo Electric Power Co., in Tokyo on Sunday, December 4, 2011. The utility said radioactive water has leaked from the building that houses a boiler for the desalination system. An estimated 45 tons of tainted water pooled at the boiler building and some of the water drained into a side ditch that reaches the sea, the company officials said. (Photo by TEPCO/AFLO) [0006] -mis-](http://cdn.c.photoshelter.com/img-get/I0000wE4Bzdo7LSc/t/124/I0000wE4Bzdo7LSc.jpg)
![December 4, 2011, Okumamachi, Japan - Water seeps through a hair-thin crack in the base concrete of a desalination facility at Fukushima No. 1 nuclear power plant in Okumamachi, Fukushima Prefecture, some 210km northeast of Tokyo in this photo released by Tokyo Electric Power Co., in Tokyo on Sunday, December 4, 2011. The utility said radioactive water has leaked from the building that houses a boiler for the desalination system. An estimated 45 tons of tainted water pooled at the boiler building and some of the water drained into a side ditch that reaches the sea, the company officials said. (Photo by TEPCO/AFLO) [0006] -mis-](http://cdn.c.photoshelter.com/img-get/I0000pHhLL7HX.TU/t/124/I0000pHhLL7HX.TU.jpg)